Overview of
Track Record
 
 

• Nang Nuan

 
 

• Al Shaheen

 
  • Soroosh  
 
 
 
Client Thai Shell Exploration & Production Co.
Field Nang Nuan, Gulf of Thailand.
Project Nang Nuan B-01 well (1993-1997).
Scope Supply, operation and management of a marginal field Floating Production System for the early production of the Nang Nuan B-01 well. The system was engineered, installed and operated by our wholly-owned subsidiary Dromond Shipping and supplied to Thai Shell on a turnkey basis.
 
     
     
  The system consisted of:  
 
FPU – MV Pacific Taipan, (a temporarily converted Swire Pacific Offshore Anchor Handling Tug Supply vessel) and associated mooring systems.
12,000 bopd x 5MMscf/d throughput capacity production process system.
40,000 dwt shuttle tanker MT Emerald Sea.
Berthing tug and Fi-Fi support Stand-by Vessel, MV Pacific Maple.
Dynamic production catenary hose and Floating export hose.
Total Offshore Terminal Management, includ-ing all pilotage sevices.
Safety Case.
 
     
     
  The contract ran for four years, and was an excellent illustration of the way in which marine, production and logistics expertise could be harnessed to cost-effectively create a single innovative solution for the production of this marginal field.  
   
   
 
  © Swire Production Solutions. All rights reserved. Best viewed under 1024x768 resolutions