The jack-up MOPU ESP 1, a
1977 built Le Tourneau 82 Class jack-up drilling
unit converted to a production unit in 1997. A
substantial upgrade programme, including installation
of a new power generation module, additional leg
strengthening and change in class, involved major
modifications to the rig and production process
system.
The initial 20 months contract was for contract
was for turnkey supply and operation of the MOPU
to be located alongside a new production jacket
in the Soroosh field and producing via an 18-inch
five-kilometre pipe to an FSU. During contract
extensions additional modifications were requested
included the addition of a 50,000 bbls/day water
injection facility as well as process upgrades. |